Mdot traffic lansing11/10/2022 The traffic signal work along Okemos Rd will began in November 2021 and is ongoing. Hope Rd, Science Parkway, Bennett Rd/Kinawa Rd, and Tamarack Drive. This project also includes upgrading traffic signals at the following Okemos Rd intersections: Hamilton Rd, Mt. The pedestrian truss on the West side of Okemos Road will remain in place, however pedestrian traffic may be restricted during periods of construction. NB Okemos traffic will be maintained throughout construction except for a brief period to accommodate construction staging. SB Okemos Rd detour is scheduled to begin on or about Februand will continue until November 2022. SB Okemos Road traffic will be detoured via Grand River Ave (M-43), Dobie Rd, and Jolly Rd. Hope intersection reconstruction, traffic signal and sidewalk/ramp reconstruction. – Replacement of existing NB and SB structures with single 5 lane, single span bridge including pedestrian facility along the east side, along with bridge approach and Mt. Hope Road and Clinton Street, Meridian Twp. Okemos Road Bridge over the Red Cedar River between Mt. OKEMOS ROAD BRIDGE OVER RED CEDAR RIVER (Revised) Jan/2022 #Mdot traffic lansing upgrade#Highway Safety Improvement Program to upgrade the horizontal curve signing. Vevay, Ingham, Bunkerhill, & Stockbridge Townships: This project will be done as planned when weather permits in spring 2022. Traffic will be maintained, but with various lane closures during work operations. Milling existing pavement, asphalt resurfacing, curb repairs. 2022 Ingham County Major Road & Bridge Projects
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |